MV Flora, the 330 m long bulk carrier, which has run aground, and was almost cut in half, arrived after being re-floated offshore in Indonesia and heavily reinforced, at her China dry-dock location.
TRESIOS calculated in-house all the required structural strengthening and performed all required towage and lifting calculations according to DNV regulations, using sophisticated design methods, which enabled efficient implementation of the design in-field and safe & timely project execution.
All the works have been prepared and approved under the relevant Legislation/Guidance – Codes and Standards & approved by Local MWS surveyors & DNV China. TRESIOS engineers monitored the works on 24/7 basis remotely and in-field, coordinating the workflow and guiding all involved parties.
We at TRESIOS assist companies with salvage, repair, modifications, or transport heavy cargo offshore. Our team is available to start anytime required and provide added value to your projects!